Project 02: TASCHENBERGPALAIS – Hotel Kempinski
The Hotel Taschenbergpalais Kempinski Dresden is a classic grand hotel. Built in the 18th century by Augustus the Strong for his mistress, Anna Constantia, Countess of Cosel, and faithfully restored in 1995, the Hotel Taschenbergpalais Kempinski combines Baroque and modern elegance. Set opposite Dresden’s most famous landmarks, such as the Semperoper, the Zwinger and the Green Vault, the Taschenbergpalais offers 213 elegant rooms and generous suites.
The hotel opened in 1995 as Saxony’s first five-star hotel. In 2023 the Hotel Taschenbergpalais Kempinski Dresden was comprehensively refurbished: both the rooms and the Café Vestibül now meet the highest standards of contemporary, luxurious interior design.
- Role
- Project management,Team lead,BIM Manager,partial site management
- Team
- 15 people
- Type
- Refurbishment
- Location
- Dresden
- GFA
- 18,500 m²
- Year
- 2022–2024
- HOAI stages
- 1–8
- Link
- tssb.de/projekte/taschenbergpalais
* References on request
Before & After – Lobby and patisserie
The lobby, elegant and modern with large new sandstone slabs, surprises guests with unique new works of art. The new Patisserie Amalia also offers a culinary experience in a special setting, where an assortment of armchairs and sofas, hand-embroidered paper and shades, table lamps and curated artworks invite guests to linger.
Before & After – The bridal suite
* The bridal suites are spread across every floor, and each has been furnished in a different style: four suites in four different styles in all.
- Room
- Bridal suite
- Number
- 4
- Size
- 71 m² each
The Royal Suite | King: the construction drawings
* The hotel’s new concept, designed by interior architect Markus Hilzinger, draws throughout on the history of the palace. The Royal Suite can also be divided into separate Queen and King suites.
- Room
- Royal Suite
- Size
- Queen = 161 m²King = 204 m²
- Total
- 365 m²
The Royal Suite | Queen: the construction drawings
Luxurious materials from different parts of the world give each of the 19 royal rooms its own character.
Every material and object is unique and individually placed.
The rooms
The Taschenberg project involved ten months of preliminary planning before work began on site. Around 50 contractors were coordinated on site, and construction was completed within the contractual schedule.
Next project: BEHR’SCHE VILLA DRESDEN
03 — Listed monument, conversion into an office building
Grazie Thank you
Let’s talk about your project.
Legal notice ·
Privacy
© 2026 Laghi Baudesign